<thead id="jv9tf"></thead>

    <track id="jv9tf"></track>
      <track id="jv9tf"></track>

                • (+966) 13-8327600

                • info@acco-sa.com

                Projects

                Foam Kid Fire Fighting Pipe Line-Qatif

                Foam Kid Fire Fighting Pipe Line-Qatif

                • Client
                  MultiLines Construction And Technical Services
                • Duration
                  3months
                • Location
                  Qatif
                • Value
                  650,000.00 SR
                • Year Completed
                  2010
                 
                BULK PLANT-testing and commissioning of gt3 substation electrical equipment’s in hawiay gas plant.
                Includes testing and commissioning of 13.8 kv mv metal glad double-ended switchgears, 4.16 kv mv motor control centers, 480 volts lvmetal clad double-ended switchgears, and power transformer.
                 
                gaz plan

                Categories

                Completed Project

                Can We Help?

                +966 (13) 8327600